Skip to content
RigMyFishFind a Rig

How to Tie a Figure-Eight Loop

beginner · Make a loop

MonofilamentFluorocarbon

Making a fixed loop at the end of doubled fishing line

Make a loop connection-category illustration, not a knot-tying diagram
Make a loop · Connection type illustration

An easy-to-inspect loop that can be used in compatible leader systems.

Also called: Figure 8 Loop

Before you tie: Check bulk and suitability before using it with a particular leader system.
Start tying: 4 steps ↓

Tie it step by step

The standing line is the long section leading to your rod. The tag end is the short free end you work with.

0 of 4 steps practiced. Check off each step as you learn.

  1. Step 1

    Double six to eight inches of line into a working bight.

  2. Step 2

    Take the bight across the paired standing sections to form an opening.

  3. Step 3

    Carry the bight around those paired sections and back through the opening, drawing a figure-eight shape.

  4. Step 4

    Moisten, arrange both strands parallel, and draw the loop against the standing sections to seat it.

Follow the line path

Use this original summary alongside the linked visual reference, especially for the crossings and hand placement. Cover artwork is not a tying diagram.

Open the visual tying reference ↗ (new tab)

Reference: Take Me Fishing · Guide checked 2026-11-07

Common Mistakes

  • •Making a simple overhand rather than a figure eight
  • •Crossing the doubled strands while seating
Dress the two strands side by side before applying full tension.

Compare other connections

Browse the full knot library →

Explore a complete rig next

See the components and choose a connection that suits your line and tackle.

Common Questions

When should I use the Figure-Eight Loop?

An easy-to-inspect loop that can be used in compatible leader systems.

What is the most common mistake tying the Figure-Eight Loop?

Making a simple overhand rather than a figure eight

Any tips for a stronger Figure-Eight Loop?

Dress the two strands side by side before applying full tension.